Back to the backflow review queue

Backflow assembly test: 4581 Ridgeview Way

Approved

Filed May 2, 2025 by Parker Fairley, Patriot Backflow Testing. Filed from a phone.

Report

Date of service
May 2, 2025
Assembly type
PVB
Serial number
W696721
Size
3/4
Test gauge serial
G-9907
Gauge calibration date
Aug 7, 2024
Check valve 1
4.4 psid
Check valve 1 closed tight
Yes
Check valve 2
3.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 107-83-01197
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

4581 Ridgeview Way
Owner: Taylor Fairley
Parcel 107-83-01197