Back to the backflow review queue

Backflow assembly test: 469 Stone Gate Way

Approved

Filed Jul 27, 2024 by Parker Vance, Summit Backflow Testing. Filed from a phone.

Report

Date of service
Jul 27, 2024
Assembly type
RP
Serial number
W195367
Size
3/4
Test gauge serial
G-4838
Gauge calibration date
Mar 30, 2024
Check valve 1
8.8 psid
Check valve 1 closed tight
Yes
Check valve 2
2.5 psid
Relief valve opened at
2.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Vance, current on the service date
  • All required fields present
  • Address matches parcel 107-61-01215
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

469 Stone Gate Way
Owner: Blake Fairley
Parcel 107-61-01215