Back to the backflow review queue
Backflow assembly test: Two Rivers Animal Hospital
ApprovedFiled Jul 11, 2026 by Parker Vance, Summit Backflow Testing. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Jul 11, 2026
- Assembly type
- RP
- Serial number
- A608878
- Size
- 4
- Test gauge serial
- G-3494
- Gauge calibration date
- Nov 19, 2025
- Check valve 1
- 9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.6 psid
- Relief valve opened at
- 3.4 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Vance, current on the service date
- All required fields present
- Address matches parcel 107-14-01122
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
5165 Stone Gate Rd
Owner: Lindqvist Holdings LLC
Parcel 107-14-01122