Back to the backflow review queue

Backflow assembly test: Maple Leaf Medical Offices

Approved

Filed Oct 12, 2024 by Parker Fairley, Patriot Backflow Testing. Filed from a phone.

Report

Date of service
Oct 12, 2024
Assembly type
RP
Serial number
Z907935
Size
2
Test gauge serial
G-5260
Gauge calibration date
Apr 28, 2024
Check valve 1
8 psid
Check valve 1 closed tight
Yes
Check valve 2
2.1 psid
Relief valve opened at
2.7 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 107-21-01200
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

6516 Sycamore Trl
Owner: Nguyen Holdings LLC
Parcel 107-21-01200