Back to the backflow review queue

Backflow assembly test: 3809 Stone Gate Dr

Approved

Filed Oct 24, 2024 by Avery Stroud, Valley Plumbing & Backflow. Filed from a phone.

Report

Date of service
Oct 24, 2024
Assembly type
PVB
Serial number
K766101
Size
3/4
Test gauge serial
G-8547
Gauge calibration date
Aug 13, 2024
Check valve 1
8.6 psid
Check valve 1 closed tight
Yes
Check valve 2
3.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Avery Stroud, current on the service date
  • All required fields present
  • Address matches parcel 107-54-01208
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

3809 Stone Gate Dr
Owner: Jordan Wexler
Parcel 107-54-01208