Back to the backflow review queue

Backflow assembly test: Golden Diner

Approved

Filed Nov 16, 2025 by Quinn Ashby, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 16, 2025
Assembly type
RP
Serial number
Z533300
Size
2
Test gauge serial
G-1894
Gauge calibration date
May 1, 2025
Check valve 1
4.9 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Relief valve opened at
4.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Ashby, current on the service date
  • All required fields present
  • Address matches parcel 095-78-01122
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1359 Orchard Way
Owner: Calloway Holdings LLC
Parcel 095-78-01122