Back to the backflow review queue

Backflow assembly test: Blue Heron Elementary School

Approved

Filed Feb 9, 2024 by Quinn Ashby, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Feb 9, 2024
Assembly type
DC
Serial number
K324688
Size
1
Test gauge serial
G-5264
Gauge calibration date
Aug 14, 2023
Check valve 1
4.9 psid
Check valve 1 closed tight
Yes
Check valve 2
1.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Ashby, current on the service date
  • All required fields present
  • Address matches parcel 095-76-01205
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2290 Ridgeview Ln
Owner: Stroud Holdings LLC
Parcel 095-76-01205