Back to the backflow review queue

Backflow assembly test: Main Street Market

Approved

Filed Sep 12, 2024 by Emerson Calloway, Summit Backflow Testing. Filed from a phone.

Report

Date of service
Sep 12, 2024
Assembly type
DC
Serial number
Z124834
Size
1
Test gauge serial
G-8071
Gauge calibration date
Feb 23, 2024
Check valve 1
8.7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.9 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Emerson Calloway, current on the service date
  • All required fields present
  • Address matches parcel 093-80-01347
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

5081 Cedar Hollow Ln
Owner: Calloway Holdings LLC
Parcel 093-80-01347