Back to the septic review queue

Septic maintenance (pump-out): 5089 Stone Gate Ln

Approved

Filed Jun 23, 2020 by Riley Harlow, Summit Wastewater. Filed from a phone.

Report

Date of service
Jun 23, 2020
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
959 gal
Sludge depth
28 in
Scum depth
4 in
Baffles in good condition
No
Effluent filter
Cleaned
Lids and risers secure
No
Distribution box level, clear and undamaged
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Permitted land-application site
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Riley Harlow, current on the service date
  • All required fields present
  • Address matches parcel 089-34-01188
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Unsecured lids are a safety hazard.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5089 Stone Gate Ln
Owner: Jordan Okafor
Parcel 089-34-01188