Back to the septic review queue

Septic maintenance (pump-out): 6420 Orchard Ct

Approved

Filed Oct 28, 2023 by Parker Marsh, Clearwater Wastewater. Filed from a phone.

Report

Date of service
Oct 28, 2023
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
1000 gal
Sludge depth
27 in
Scum depth
2 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
No
Alarm tested and working
No
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
Yes
Repair needed: describe
Cracked lid
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Marsh, current on the service date
  • All required fields present
  • Address matches parcel 087-85-01212
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Pump or floats reported not working.
  • Alarm reported not working.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

6420 Orchard Ct
Owner: Cameron Ellery
Parcel 087-85-01212