Back to the backflow review queue

Backflow assembly test: 142 Turkey Hill Trl

Approved

Filed Jan 5, 2026 by Cameron Nguyen, Clearwater Backflow Testing. Filed from a phone.

Report

Date of service
Jan 5, 2026
Assembly type
PVB
Serial number
W176271
Size
3/4
Test gauge serial
G-6029
Gauge calibration date
Apr 13, 2025
Check valve 1
4.8 psid
Check valve 1 closed tight
Yes
Check valve 2
3.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 085-83-01070
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

142 Turkey Hill Trl
Owner: Morgan Pruitt
Parcel 085-83-01070