Back to the backflow review queue
Backflow assembly test: Main Street Medical Offices
Sent backFiled Nov 19, 2026 by Cameron Nguyen, Clearwater Backflow Testing. Filed from a phone.
Report
- Date of service
- Nov 19, 2026
- Assembly type
- DC
- Serial number
- K732835
- Size
- 1 1/2
- Test gauge serial
- G-7708
- Gauge calibration date
- Feb 15, 2026
- Check valve 1
- 5.2 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 2.6 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Cameron Nguyen, current on the service date
- All required fields present
- Address matches parcel 085-39-01271
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Sent back Please add the test gauge calibration certificate.
Property
4739 Spring Branch Dr
Owner: Nguyen Holdings LLC
Parcel 085-39-01271