Back to the backflow review queue

Backflow assembly test: Main Street Medical Offices

Approved

Filed Nov 27, 2025 by Logan Danner, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 27, 2025
Assembly type
DC
Serial number
K732835
Size
1 1/2
Test gauge serial
G-4986
Gauge calibration date
May 13, 2025
Check valve 1
3.6 psid
Check valve 1 closed tight
Yes
Check valve 2
1.6 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Logan Danner, current on the service date
  • All required fields present
  • Address matches parcel 085-39-01271
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

4739 Spring Branch Dr
Owner: Nguyen Holdings LLC
Parcel 085-39-01271