Back to the backflow review queue

Backflow assembly test: 7551 Cedar Hollow Ln

Approved

Filed Feb 27, 2026 by Parker Okafor, Summit Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
Feb 27, 2026
Assembly type
DC
Serial number
K854602
Size
1
Test gauge serial
G-3689
Gauge calibration date
Aug 30, 2025
Check valve 1
8.5 psid
Check valve 1 closed tight
Yes
Check valve 2
1.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Okafor, current on the service date
  • All required fields present
  • Address matches parcel 079-56-01018
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

7551 Cedar Hollow Ln
Owner: Blake Kessler
Parcel 079-56-01018