Back to the backflow review queue

Backflow assembly test: 325 Pine Knoll Rd

Approved

Filed May 21, 2026 by Parker Okafor, Summit Backflow Testing. Read in from a paper form and confirmed by staff.

Report

Date of service
May 21, 2026
Assembly type
DC
Serial number
A801847
Size
3/4
Test gauge serial
G-9461
Gauge calibration date
Jun 19, 2025
Check valve 1
0.6 psid
Check valve 1 closed tight
No
Check valve 2
2 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Okafor, current on the service date
  • All required fields present
  • Address matches parcel 079-74-01214
  • Readings in range, no flags
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

325 Pine Knoll Rd
Owner: Emerson Whitcomb
Parcel 079-74-01214