Back to the septic review queue

Septic maintenance (pump-out): 9139 Ridgeview Way

Approved

Filed Jan 15, 2020 by Logan Nguyen, Summit Pumping Co. Filed from a phone.

Report

Date of service
Jan 15, 2020
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Drainfield or mound
Gallons pumped
911 gal
Sludge depth
25 in
Scum depth
7 in
Baffles in good condition
No
Effluent filter
None present
Lids and risers secure
Yes
Drainfield or mound: no surfacing, soggy ground or odor
No
Disposal site
Regional wastewater plant
Repair needed
Yes
Repair needed: describe
Cracked lid
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Logan Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 079-59-01120
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Surfacing, soggy ground or odor at the drainfield or mound.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9139 Ridgeview Way
Owner: Taylor Lindqvist
Parcel 079-59-01120