Back to the backflow review queue

Backflow assembly test: 2224 Hickory Way

Filed Nov 28, 2026 by Jamie Vance, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Nov 28, 2026
Assembly type
PVB
Serial number
Z605908
Size
1
Test gauge serial
G-9698
Gauge calibration date
Mar 28, 2026
Check valve 1
4 psid
Check valve 1 closed tight
Yes
Check valve 2
3.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Vance, current on the service date
  • All required fields present
  • Address matches parcel 075-44-01344
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Property

2224 Hickory Way
Owner: Logan Ellery
Parcel 075-44-01344