Back to the backflow review queue

Backflow assembly test: 5837 Turkey Hill Ct

Approved

Filed Jul 24, 2024 by Quinn Stroud, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jul 24, 2024
Assembly type
RP
Serial number
Z980665
Size
1
Test gauge serial
G-8890
Gauge calibration date
Mar 19, 2024
Check valve 1
7 psid
Check valve 1 closed tight
Yes
Check valve 2
1.6 psid
Relief valve opened at
3.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Stroud, current on the service date
  • All required fields present
  • Address matches parcel 075-29-01124
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

5837 Turkey Hill Ct
Owner: Drew Calloway
Parcel 075-29-01124