Back to the backflow review queue

Backflow assembly test: Golden Car Wash

Approved

Filed Oct 24, 2026 by Hayden Danner, Keystone Plumbing & Backflow. Filed from a phone.

Report

Date of service
Oct 24, 2026
Assembly type
RP
Serial number
Z617315
Size
1 1/2
Test gauge serial
G-9065
Gauge calibration date
Feb 24, 2026
Check valve 1
3.4 psid
Check valve 1 closed tight
Yes
Check valve 2
1.5 psid
Relief valve opened at
3.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Danner, current on the service date
  • All required fields present
  • Address matches parcel 071-67-01237
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

3866 Cedar Hollow Trl
Owner: Vance Holdings LLC
Parcel 071-67-01237