Back to the backflow review queue

Backflow assembly test: 8918 Mill Creek Rd

Approved

Filed Jul 29, 2026 by Blake Danner, Summit Backflow Testing. Filed from a phone.

Report

Date of service
Jul 29, 2026
Assembly type
RP
Serial number
B395485
Size
1
Test gauge serial
G-7611
Gauge calibration date
Mar 20, 2026
Check valve 1
4 psid
Check valve 1 closed tight
Yes
Check valve 2
3.7 psid
Relief valve opened at
4.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Blake Danner, current on the service date
  • All required fields present
  • Address matches parcel 071-50-01308
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

8918 Mill Creek Rd
Owner: Parker Ramirez
Parcel 071-50-01308