Back to the backflow review queue

Backflow assembly test: 2298 Cedar Hollow Ct

Approved

Filed Aug 31, 2026 by Quinn Wexler, Lakeside Plumbing & Backflow. Filed from a phone.

Report

Date of service
Aug 31, 2026
Assembly type
DC
Serial number
Z772095
Size
3/4
Test gauge serial
G-4270
Gauge calibration date
Jun 2, 2026
Check valve 1
3.6 psid
Check valve 1 closed tight
Yes
Check valve 2
1.7 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Wexler, current on the service date
  • All required fields present
  • Address matches parcel 067-50-01083
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2298 Cedar Hollow Ct
Owner: Parker Nguyen
Parcel 067-50-01083