Back to the backflow review queue
Backflow assembly test: 130 Spring Branch Way
ApprovedFiled Mar 20, 2026 by Quinn Wexler, Lakeside Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- Mar 20, 2026
- Assembly type
- RP
- Serial number
- A296262
- Size
- 3/4
- Test gauge serial
- G-3676
- Gauge calibration date
- Feb 26, 2025
- Check valve 1
- 0.5 psid
- Check valve 1 closed tight
- No
- Check valve 2
- 1.9 psid
- Relief valve opened at
- 2.9 psid
- Result
- Fail
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Quinn Wexler, current on the service date
- All required fields present
- Address matches parcel 067-45-01173
- Test gauge calibration is more than a year old.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
130 Spring Branch Way
Owner: Parker Vance
Parcel 067-45-01173