Back to the stormwater review queue

Stormwater facility inspection: Golden Taqueria

Approved

Filed Dec 23, 2024 by Hayden Wexler, Northstar Engineering. Filed from a phone.

Report

Date of service
Dec 23, 2024
Facility type
Manufactured treatment device
Sediment accumulation
31 % of capacity
Inlet and outlet clear
Yes
Erosion or embankment damage
No
Vegetation maintained
Yes
Functioning as designed
Yes
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Wexler, current on the service date
  • All required fields present
  • Address matches parcel 065-17-01017
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

9028 Cedar Hollow Dr
Owner: Nguyen Holdings LLC
Parcel 065-17-01017