Back to the backflow review queue
Backflow assembly test: 5058 Ridgeview Way
ApprovedFiled Dec 5, 2024 by Parker Okafor, Valley Plumbing & Backflow. Read in from a paper form and confirmed by staff.
Report
- Date of service
- Dec 5, 2024
- Assembly type
- RP
- Serial number
- W932888
- Size
- 3/4
- Test gauge serial
- G-2510
- Gauge calibration date
- Jun 12, 2024
- Check valve 1
- 8.3 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.9 psid
- Relief valve opened at
- 3.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Okafor, current on the service date
- All required fields present
- Address matches parcel 065-36-01104
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
5058 Ridgeview Way
Owner: Drew Whitcomb
Parcel 065-36-01104