Back to the backflow review queue

Backflow assembly test: 4070 Stone Gate Ln

Approved

Filed May 17, 2026 by Reese Calloway, Clearwater Backflow Testing. Filed from a phone.

Report

Date of service
May 17, 2026
Assembly type
PVB
Serial number
A936548
Size
3/4
Test gauge serial
G-3593
Gauge calibration date
Sep 15, 2025
Check valve 1
5.3 psid
Check valve 1 closed tight
Yes
Check valve 2
3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Reese Calloway, current on the service date
  • All required fields present
  • Address matches parcel 065-44-01217
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

4070 Stone Gate Ln
Owner: Shawn Fairley
Parcel 065-44-01217