Back to the backflow review queue

Backflow assembly test: 2704 Pine Knoll Way

Approved

Filed May 5, 2026 by Casey Pruitt, Clearwater Plumbing & Backflow. Filed from a phone.

Report

Date of service
May 5, 2026
Assembly type
PVB
Serial number
K480684
Size
1
Test gauge serial
G-3121
Gauge calibration date
Mar 5, 2026
Check valve 1
4.5 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Casey Pruitt, current on the service date
  • All required fields present
  • Address matches parcel 061-25-01155
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2704 Pine Knoll Way
Owner: Parker Hollins
Parcel 061-25-01155