Back to the backflow review queue

Backflow assembly test: 2262 Stone Gate Trl

Approved

Filed Nov 27, 2025 by Logan Stroud, Ridge Backflow Testing. Filed from a phone.

Report

Date of service
Nov 27, 2025
Assembly type
RP
Serial number
A429201
Size
1
Test gauge serial
G-4325
Gauge calibration date
Jun 19, 2025
Check valve 1
8.2 psid
Check valve 1 closed tight
Yes
Check valve 2
3.4 psid
Relief valve opened at
3.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Logan Stroud, current on the service date
  • All required fields present
  • Address matches parcel 059-30-01170
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

2262 Stone Gate Trl
Owner: Emerson Calloway
Parcel 059-30-01170