Back to the backflow review queue

Backflow assembly test: 5798 Stone Gate Way

Approved

Filed Jan 7, 2026 by Parker Brandt, Heritage Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jan 7, 2026
Assembly type
PVB
Serial number
K647793
Size
3/4
Test gauge serial
G-4391
Gauge calibration date
Nov 12, 2025
Check valve 1
6.1 psid
Check valve 1 closed tight
Yes
Check valve 2
1.1 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Brandt, current on the service date
  • All required fields present
  • Address matches parcel 055-64-01312
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5798 Stone Gate Way
Owner: Quinn Vance
Parcel 055-64-01312