Back to the backflow review queue

Backflow assembly test: 8501 Pine Knoll Way

Approved

Filed Jan 6, 2025 by Cameron Kessler, Summit Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jan 6, 2025
Assembly type
PVB
Serial number
A438246
Size
1
Test gauge serial
G-2744
Gauge calibration date
Jun 27, 2024
Check valve 1
7 psid
Check valve 1 closed tight
Yes
Check valve 2
2.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Cameron Kessler, current on the service date
  • All required fields present
  • Address matches parcel 053-19-01298
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

8501 Pine Knoll Way
Owner: Cameron Danner
Parcel 053-19-01298