Back to the backflow review queue

Backflow assembly test: Crossroads Taqueria

Approved

Filed Jul 2, 2024 by Parker Fairley, Patriot Plumbing & Backflow. Filed from a phone.

Report

Date of service
Jul 2, 2024
Assembly type
DC
Serial number
Z202169
Size
2
Test gauge serial
G-6129
Gauge calibration date
Mar 2, 2024
Check valve 1
5.5 psid
Check valve 1 closed tight
Yes
Check valve 2
3 psid
Result
Repaired and passed
Repairs made
Replaced check valve 1 rubber
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 053-93-01142
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

5419 Orchard Rd
Owner: Benton Holdings LLC
Parcel 053-93-01142