Back to the backflow review queue
Backflow assembly test: 9227 Cedar Hollow Ln
ApprovedFiled May 9, 2026 by Parker Pruitt, Patriot Plumbing & Backflow. Filed from a phone.
Report
- Date of service
- May 9, 2026
- Assembly type
- PVB
- Serial number
- A185384
- Size
- 1
- Test gauge serial
- G-9159
- Gauge calibration date
- Aug 10, 2025
- Check valve 1
- 6.7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 3.9 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Parker Pruitt, current on the service date
- All required fields present
- Address matches parcel 053-77-01345
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
9227 Cedar Hollow Ln
Owner: Parker Benton
Parcel 053-77-01345