Back to the backflow review queue

Backflow assembly test: Corner Bakery

Approved

Filed Mar 19, 2026 by Parker Fairley, Patriot Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Mar 19, 2026
Assembly type
DC
Serial number
B159085
Size
1
Test gauge serial
G-5846
Gauge calibration date
Aug 15, 2025
Check valve 1
5.1 psid
Check valve 1 closed tight
Yes
Check valve 2
3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Parker Fairley, current on the service date
  • All required fields present
  • Address matches parcel 053-94-01080
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

756 Orchard Way
Owner: Wexler Holdings LLC
Parcel 053-94-01080