Back to the backflow review queue

Backflow assembly test: 5965 Ridgeview Ln

Approved

Filed Feb 27, 2024 by Shawn Nguyen, Valley Plumbing & Backflow. Filed from a phone.

Report

Date of service
Feb 27, 2024
Assembly type
PVB
Serial number
W480693
Size
3/4
Test gauge serial
G-3568
Gauge calibration date
Jan 25, 2024
Check valve 1
8.4 psid
Check valve 1 closed tight
Yes
Check valve 2
2.2 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Shawn Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 051-19-01138
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5965 Ridgeview Ln
Owner: Drew Ashby
Parcel 051-19-01138