Back to the backflow review queue

Backflow assembly test: 4650 Stone Gate Rd

Approved

Filed Mar 29, 2026 by Shawn Nguyen, Valley Plumbing & Backflow. Filed from a phone.

Report

Date of service
Mar 29, 2026
Assembly type
DC
Serial number
A824817
Size
1
Test gauge serial
G-4569
Gauge calibration date
Jan 23, 2026
Check valve 1
5.2 psid
Check valve 1 closed tight
Yes
Check valve 2
3.5 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Shawn Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 051-44-01212
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

4650 Stone Gate Rd
Owner: Drew Ellery
Parcel 051-44-01212