Back to the septic review queue
Septic maintenance (pump-out): 3016 Hickory Trl
ApprovedFiled Nov 20, 2021 by Riley Nguyen, Heritage Wastewater. Filed from a phone.
Report
- Date of service
- Nov 20, 2021
- Tank size
- 1000 gal
- Compartments
- 2
- Parts this system has
- Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
- Gallons pumped
- 1020 gal
- Sludge depth
- 34 in
- Scum depth
- 3 in
- Baffles in good condition
- Yes
- Effluent filter
- Replaced
- Lids and risers secure
- Yes
- Pump runs and the floats turn it on and off
- No
- Alarm tested and working
- Yes
- Drainfield or mound: no surfacing, soggy ground or odor
- Yes
- Disposal site
- Regional wastewater plant
- Repair needed
- Yes
- Repair needed: describe
- Cracked lid
- Photos
- None
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Riley Nguyen, current on the service date
- All required fields present
- Address matches parcel 051-15-01209
- Sludge is over a third of a typical tank depth; check for system failure.
- Pump or floats reported not working.
- No photos attached.
- Result: needs follow-up. The property stays on the overdue list until a passing report arrives.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
3016 Hickory Trl
Owner: Jamie Harlow
Parcel 051-15-01209