Back to the backflow review queue
Backflow assembly test: 7231 Cedar Hollow Trl
ApprovedFiled Oct 22, 2026 by Avery Wexler, Northstar Backflow Testing. Filed from a phone.
Report
- Date of service
- Oct 22, 2026
- Assembly type
- PVB
- Serial number
- A600933
- Size
- 3/4
- Test gauge serial
- G-5887
- Gauge calibration date
- Jan 1, 2026
- Check valve 1
- 6.7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.2 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Wexler, current on the service date
- All required fields present
- Address matches parcel 041-99-01276
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.
Property
7231 Cedar Hollow Trl
Owner: Reese Okafor
Parcel 041-99-01276