Back to the backflow review queue

Backflow assembly test: 5181 Stone Gate Rd

Approved

Filed Nov 19, 2023 by Quinn Nguyen, Northstar Backflow Testing. Filed from a phone.

Report

Date of service
Nov 19, 2023
Assembly type
RP
Serial number
W317125
Size
3/4
Test gauge serial
G-2950
Gauge calibration date
Mar 1, 2023
Check valve 1
3.6 psid
Check valve 1 closed tight
Yes
Check valve 2
2.8 psid
Relief valve opened at
3.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Quinn Nguyen, current on the service date
  • All required fields present
  • Address matches parcel 041-62-01150
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

5181 Stone Gate Rd
Owner: Casey Pruitt
Parcel 041-62-01150