Back to the septic review queue

Septic maintenance (pump-out): 2118 Quarry Ln

Approved

Filed Nov 8, 2021 by Avery Stroud, Heritage Wastewater. Read in from a paper form and confirmed by staff.

Report

Date of service
Nov 8, 2021
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
945 gal
Sludge depth
14 in
Scum depth
6 in
Baffles in good condition
Yes
Effluent filter
Replaced
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Regional wastewater plant
Repair needed
No
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Avery Stroud, current on the service date
  • All required fields present
  • Address matches parcel 035-26-01119
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

2118 Quarry Ln
Owner: Rowan Nguyen
Parcel 035-26-01119