Back to the septic review queue

Septic maintenance (pump-out): 3678 Laurel Ct

Approved

Filed May 16, 2023 by Drew Hollins, Northstar Wastewater. Filed from a phone.

Report

Date of service
May 16, 2023
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
859 gal
Sludge depth
25 in
Scum depth
4 in
Baffles in good condition
Yes
Effluent filter
None present
Lids and risers secure
Yes
Distribution box level, clear and undamaged
No
Drainfield or mound: no surfacing, soggy ground or odor
Yes
Disposal site
Permitted land-application site
Repair needed
Yes
Repair needed: describe
Distribution box settled
Photos
2 attached
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Drew Hollins, current on the service date
  • All required fields present
  • Address matches parcel 035-38-01161
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Distribution box reported uneven, blocked or damaged.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

3678 Laurel Ct
Owner: Parker Nguyen
Parcel 035-38-01161