Back to the backflow review queue

Backflow assembly test: 5271 Stone Gate Trl

Approved

Filed Oct 23, 2025 by Emerson Hollins, Ridge Backflow Testing. Filed from a phone.

Report

Date of service
Oct 23, 2025
Assembly type
PVB
Serial number
K724497
Size
1
Test gauge serial
G-9617
Gauge calibration date
Sep 9, 2025
Check valve 1
8.3 psid
Check valve 1 closed tight
Yes
Check valve 2
1.3 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Emerson Hollins, current on the service date
  • All required fields present
  • Address matches parcel 025-51-01279
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

5271 Stone Gate Trl
Owner: Taylor Fairley
Parcel 025-51-01279