Back to the septic review queue

Septic maintenance (pump-out): 9699 Ridgeview Rd

Approved

Filed Jul 29, 2023 by Blake Vance, Keystone Wastewater. Filed from a phone.

Report

Date of service
Jul 29, 2023
Tank size
1250 gal
Compartments
1
Parts this system has
Septic tank, Distribution box, Drainfield or mound
Gallons pumped
1191 gal
Sludge depth
31 in
Scum depth
5 in
Baffles in good condition
No
Effluent filter
None present
Lids and risers secure
Yes
Distribution box level, clear and undamaged
Yes
Drainfield or mound: no surfacing, soggy ground or odor
No
Disposal site
County treatment plant
Repair needed
Yes
Repair needed: describe
Distribution box settled
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Blake Vance, current on the service date
  • All required fields present
  • Address matches parcel 023-54-01353
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Baffles reported damaged; county may require repair.
  • Surfacing, soggy ground or odor at the drainfield or mound.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9699 Ridgeview Rd
Owner: Riley Lindqvist
Parcel 023-54-01353