Back to the backflow review queue
Backflow assembly test: 6735 Mill Creek Rd
ApprovedFiled Apr 7, 2026 by Avery Ashby, Summit Backflow Testing. Filed from a phone.
Report
- Date of service
- Apr 7, 2026
- Assembly type
- RP
- Serial number
- A613563
- Size
- 1
- Test gauge serial
- G-4595
- Gauge calibration date
- Mar 3, 2026
- Check valve 1
- 6.9 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.9 psid
- Relief valve opened at
- 2.6 psid
- Result
- Pass
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Avery Ashby, current on the service date
- All required fields present
- Address matches parcel 017-38-01063
- Readings in range, no flags
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
6735 Mill Creek Rd
Owner: Shawn Calloway
Parcel 017-38-01063