Back to the backflow review queue

Backflow assembly test: 9328 Orchard Way

Approved

Filed May 31, 2026 by Casey Benton, Patriot Backflow Testing. Filed from a phone.

Report

Date of service
May 31, 2026
Assembly type
PVB
Serial number
B301882
Size
3/4
Test gauge serial
G-6820
Gauge calibration date
Feb 21, 2026
Check valve 1
7.8 psid
Check valve 1 closed tight
Yes
Check valve 2
1.4 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Casey Benton, current on the service date
  • All required fields present
  • Address matches parcel 013-82-01151
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9328 Orchard Way
Owner: Jamie Hollins
Parcel 013-82-01151