Back to the backflow review queue

Backflow assembly test: Crossroads Diner

Approved

Filed Aug 25, 2025 by Casey Calloway, Valley Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Aug 25, 2025
Assembly type
RP
Serial number
B485202
Size
1 1/2
Test gauge serial
G-1277
Gauge calibration date
Dec 2, 2024
Check valve 1
4.9 psid
Check valve 1 closed tight
Yes
Check valve 2
3.7 psid
Relief valve opened at
3.8 psid
Result
Pass
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Casey Calloway, current on the service date
  • All required fields present
  • Address matches parcel 013-93-01033
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

9138 Pine Knoll Way
Owner: Okafor Holdings LLC
Parcel 013-93-01033