Back to the backflow review queue

Backflow assembly test: Blue Heron Self Storage

Approved

Filed Sep 23, 2025 by Casey Calloway, Valley Plumbing & Backflow. Read in from a paper form and confirmed by staff.

Report

Date of service
Sep 23, 2025
Assembly type
RP
Serial number
W845441
Size
1 1/2
Test gauge serial
G-7533
Gauge calibration date
Jun 26, 2024
Check valve 1
0.5 psid
Check valve 1 closed tight
No
Check valve 2
2.1 psid
Relief valve opened at
2.9 psid
Result
Fail
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Casey Calloway, current on the service date
  • All required fields present
  • Address matches parcel 013-58-01324
  • Test gauge calibration is more than a year old.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9789 Pine Knoll Trl
Owner: Danner Holdings LLC
Parcel 013-58-01324