Back to the backflow review queue
Backflow assembly test: Two Rivers Market
ApprovedFiled Jul 29, 2024 by Jamie Whitcomb, Northstar Backflow Testing. Filed from a phone.
Report
- Date of service
- Jul 29, 2024
- Assembly type
- RP
- Serial number
- W508526
- Size
- 2
- Test gauge serial
- G-6762
- Gauge calibration date
- Apr 20, 2023
- Check valve 1
- 7 psid
- Check valve 1 closed tight
- Yes
- Check valve 2
- 1.8 psid
- Relief valve opened at
- 1.4 psid
- Result
- Repaired and passed
- Repairs made
- Replaced check valve 1 rubber
- I certify this report is true and that I performed or supervised the work
- Yes
Automatic checks
- License on file for Jamie Whitcomb, current on the service date
- All required fields present
- Address matches parcel 013-15-01102
- RP relief valve must open at 2.0 psid or more.
- Test gauge calibration is more than a year old.
- Result: passing. Next due date resets when approved.
Decision
Approved by J. Staff. The property's next due date is set and the owner gets a receipt.
Property
7767 Spring Branch Rd
Owner: Calloway Holdings LLC
Parcel 013-15-01102