Back to the septic review queue

Septic maintenance (pump-out): 1820 Stone Gate Trl

Approved

Filed Dec 25, 2023 by Jamie Ellery, Summit Wastewater. Filed from a phone.

Report

Date of service
Dec 25, 2023
Tank size
1000 gal
Compartments
2
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
939 gal
Sludge depth
26 in
Scum depth
6 in
Baffles in good condition
Yes
Effluent filter
Cleaned
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
No
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
No
Disposal site
Regional wastewater plant
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jamie Ellery, current on the service date
  • All required fields present
  • Address matches parcel 007-30-01069
  • Sludge is over a third of a typical tank depth; check for system failure.
  • Pump or floats reported not working.
  • Surfacing, soggy ground or odor at the drainfield or mound.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

1820 Stone Gate Trl
Owner: Logan Hollins
Parcel 007-30-01069