Back to the stormwater review queue

Stormwater facility inspection: Crossroads Elementary School

Approved

Filed Jul 11, 2026 by Jordan Fairley, Lakeside Engineering. Filed from a phone.

Report

Date of service
Jul 11, 2026
Facility type
Underground detention
Sediment accumulation
8 % of capacity
Inlet and outlet clear
Yes
Erosion or embankment damage
No
Vegetation maintained
Yes
Functioning as designed
Yes
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Jordan Fairley, current on the service date
  • All required fields present
  • Address matches parcel 001-61-01357
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved automatically, because nothing was flagged. The property's next due date is set and the owner gets a receipt.

Property

1353 Meadow Lark Trl
Owner: Benton Holdings LLC
Parcel 001-61-01357