Back to the septic review queue

Septic maintenance (pump-out): 9716 Hickory Ln

Approved

Filed Jan 5, 2018 by Hayden Kessler, Summit Wastewater. Filed from a phone.

Report

Date of service
Jan 5, 2018
Tank size
1250 gal
Compartments
2
Parts this system has
Septic tank, Pump tank and effluent pump, High-water alarm, Drainfield or mound
Gallons pumped
1198 gal
Sludge depth
24 in
Scum depth
6 in
Baffles in good condition
No
Effluent filter
Cleaned
Lids and risers secure
Yes
Pump runs and the floats turn it on and off
Yes
Alarm tested and working
Yes
Drainfield or mound: no surfacing, soggy ground or odor
No
Disposal site
Permitted land-application site
Repair needed
Yes
Repair needed: describe
Outlet baffle missing
Photos
None
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Hayden Kessler, current on the service date
  • All required fields present
  • Address matches parcel 001-44-01189
  • Baffles reported damaged; county may require repair.
  • Surfacing, soggy ground or odor at the drainfield or mound.
  • No photos attached.
  • Result: needs follow-up. The property stays on the overdue list until a passing report arrives.

Decision

Approved by J. Staff. The property's next due date is set and the owner gets a receipt.

Property

9716 Hickory Ln
Owner: Morgan Whitcomb
Parcel 001-44-01189