Back to the stormwater review queue

Stormwater facility inspection: Crossroads Elementary School

Approved

Filed Apr 11, 2026 by Blake Lindqvist, Evergreen Engineering. Read in from a paper form and confirmed by staff.

Report

Date of service
Apr 11, 2026
Facility type
Dry pond
Sediment accumulation
11 % of capacity
Inlet and outlet clear
Yes
Erosion or embankment damage
No
Vegetation maintained
Yes
Functioning as designed
Yes
I certify this report is true and that I performed or supervised the work
Yes

Automatic checks

  • License on file for Blake Lindqvist, current on the service date
  • All required fields present
  • Address matches parcel 001-14-01037
  • Readings in range, no flags
  • Result: passing. Next due date resets when approved.

Decision

Approved by M. Reviewer. The property's next due date is set and the owner gets a receipt.

Property

6707 Quarry Rd
Owner: Ashby Holdings LLC
Parcel 001-14-01037